
Project details
- Client
- Noordse Park
- Function
- Inclusive playground
- Location
- Utrecht
- Floor area
- 4500 m2
Goal
Through the 'Samen Spelen' (play together) grant from the Municipality of Utrecht, the Noordse Park playground was given the opportunity to develop into an inclusive playground.
Solution
A master plan with phased implementation.
Overall plan
The main aim of the overall plan is to create a natural playground for all children, with and without disabilities.
Below is the sketch design of the master plan, showing the final vision for the playground.
Phased implementation
It is an ambitious master plan, made manageable by phased implementation.
It is based on three implementation phases:
• implementation phase 1: 1 year
• implementation phase 2: 5 years
• implementation phase 3: 10 years
The 'Samen Spelen' accessibility grant from the Municipality of Utrecht is spent on implementation phase 1, which focuses on laying the foundation of the overall plan, with extra attention to the accessibility of the existing facilities and play equipment. Rejected play equipment has been replaced. It was also decided to tackle the lack of shade in the area on the Lagenoord side, because vegetation takes a long time to develop [especially when creating shade trees].
Phase 1
- Period
- 1 YEAR
- Focus
- • Improving the accessibility of facilities and play equipment
• Creating shade
Phase 2
- Period
- 5 YEARS
- Focus
- • Replacing old play equipment
• Upgrading play and rest areas
Phase 3
- Period
- 10 YEARS
- Focus
- • Research into play value
• Implementing new results
• Refining the play area
Improving the entrance
and shared spaces
Wheelchair accessible
The main aim was to make the main building, which also houses the toilets, step-free. The entire area around these entrances has been raised.
Paths have also been laid to the play equipment to make it accessible to wheelchair users.
Acoustic wayfinding for people with a visual impairment
Besides making the building wheelchair accessible, a canopy has been placed at the main entrance. Apart from the practical reason when it rains, this canopy also helps people with a visual impairment find their way. Its acoustic properties make the entrance easier to find for this group.
filling in the large difference in height around the building so that inside and outside are level.
a functional canopy that also improves the acoustic findability of the main building entrance.

before & after
Paths
In the existing situation, the main path, which zigzags across the site, ended in an open paved square. This made the entrance of the main building, the toilets and the playground entrance on the Lagenoord side hard to find.
This problem was solved by extending the main path to the main entrance of the building, continuing it with an orthogonal structure to the Lagenoord entrance and connecting it to the toilets. This way, everyone can find their way to the shared facilities more easily.
Planting
Framing the paths with planting emphasises the structure. This automatically creates natural guidelines. Once fully grown, the planting also serves as a physical handrail.
Besides visual guidance, the planting also offers support through smell and hearing. Throughout the site, the type of planting is linked to function, and every season has been taken into account.
The entrance area is also being filled with trees that will provide shade in the long term on hot summer days, when the paddling pool is popular across the wider area.

existing & new
Automatic gate
The Lagenoord entrance was very inaccessible. There was a single narrow, high gate that was often closed to stop children from wandering off.
To make this more pleasant, a second gate has been placed inside the site. This low gate stays closed to keep children from wandering off, so that the high gate at the edge of the site can stay open during opening hours. This makes the entrance more welcoming. The gate has also been automated, with a push button on both sides, so that parents with prams and wheelchair users can open it easily.
before
high, narrow gate that was always closed
after
low gate with automatic button
The Noordse Park playground is a supervised playground for and by the neighbourhood. It is an active green space where activities are often organised. A large group of volunteers brings this place to life. This group is involved as much as possible in the phased transformation into an inclusive playground, making the whole process fun and educational. We do it together!
A look at the
building process
Many people feel involved with the place and are happy to do their bit. We use the strength of this community in the building process.
From input at the drawing board to laying the last stone together. The positive sense of togetherness at this place makes this a special project.

before & after
Opening
hours
Would you like to take a look yourself? You are welcome:
| MON | - |
|---|---|
| TUE - FRI | 10:00 - 17:00 |
| SAT | 12:00 - 17:00 |
| SUN | 10:00 - 17:00 |
Project phase 1
Phase 1 has been completed.
The entrance is accessible and spatially legible, the building and toilets are accessible, rejected equipment has been replaced, the path structure has been improved and trees have been planted to remedy the lack of shade.




